Van's Aircraft Total Performance RV Kit Planes
Service Information and Revisions RV-10 only



Service Bulletins

SB Number
Applies to
Description
MT Prop Governors
Flyweight failures
All RV-3,4,6,7,8,9,10,14
Cracking of wing aft spar web at the inboard aileron hinge bracket attach rivets.

SB 14-12-22
sb14-12-22.pdf

RV-6A,7A,8A,9A,10
Nose Stop Flange Installation
(before further flight)

SB 14-8-29
sb14-8-29.pdf

RV-10
Engine Mount
Elastomer Plate

SB 11-9-13
sb11-9-13.pdf

All models
Fuel Tank
Slosh Inspection

SB 10-1-4
sb10-1-4.pdf

RV-10
Install Door Safety Latch

SB 08-6-1
sb08-6-1.pdf

All RV-10 kits and
completed aircraft

F-1010 bulkhead reinforcement


SB 07-4-12
sb07-4-12.pdf

All RV models
with electric flaps
Securing flap motor
rod end bearing

SB 06-9-20
sb06-9-20.pdf

All builders and operators
of any model of a Van's Aircraft
kit aircraft except RV-12
Trim Cable Anchor

SB 06-2-3
sb06-2-3.pdf

RV-10

RV-10 
  Vertical Stabilizer   


SB 04-2-1
sb04-2-1.pdf

Fuel Tanks    
Inspect Fuel Tanks

SB 02-12-1
sb02-12-1.pdf

Firewall Forward Kits and
Pre-manufactured hose assemblies
Inspect Hoses 

SB 96-10-1
sb96-10-1.pdf

All RV Aircraft
except RV-12
Filtered Airbox 
       
 
 

Letters and Notices

Date Applies to Description
All Van’s Aircraft
RV Models
SAIB HQ-14-16
(all-metal lock nuts)
RV-3,4,6,7,8,9,10
Fuel Valve Lever II
         installation       
Buying a Flying RV
A letter to prospective
buyers of flying RVs 
RV-10
Door Latch Switches
All RV kits
Soft Rivets
Master Switches
shipped after
Oct 2, 2007
Inspect the back
of the switch
RV-10
Motor/
motor mount  interference
All
#2 battery cables
Possible battery cable
terminal failure
RV-10
U-1023 nose wheel
bearing spacers
RV-10
Fuselage Tunnel Temperature
RV-10
Door Handle Spur Gear
All users of a 
60 amp Alternator
60 amp Alternator
Wiring Change
RV-10
Axle nut thread depth

All builders and operators of any model of a Van's Aircraft kit aircraft
except RV-12

Filtered Airbox Advisory

Buying a
second-hand RV Kit

A letter to prospective
buyers of a second-hand
RV Kit        
GAS-3
Gascolator
Recall
Superceded
by service letter
October, 2005
Filtered Airbox Advisory
 
 
 

Revisions and Changes

                                                                         Important!

The date in a drawing's title block will not match the date it is posted to the website. The date on the drawing is the date the change was started. The date posted to the website is the completion date. There are several reasons why some revisions take longer to complete. These include the attachment of more items needing revision, delays for testing, waiting on parts etc.

 

                                                            (Numerical number indicates plans section number)
                                                                               MM
= Maintenance Manual
                                                                            POH = Pilot Operating Handbook
                                                                      PAP = Production Acceptance Procedures

As of February 2013 changes are posted as a multipage PDF. The first page includes the revision description giving
the builder a synopsis of what changed on each page. Subsequent pages include pages changed by that revision.

Manual Section
Date Posted
03/01/2017
01/27/2017
01/06/2017
10/02/2014
10/02/2014
11/04/2009
11/04/2009
11/04/2009
12/11/2008
12/08/2008
06/14/2005
03/10/2005
03/09/2005
11/16/2004
11/15/2004
11/15/2004
11/15/2004
11/15/2004
08/08/2004

 

Home Contact Us Safety and Service Information Policies Site Map